Spanish Rocket Firm Signs First Commercial Launch
The deal opens a European route to orbit for small satellites, with MIURA 5's first orbital flight targeted for 2027.
Updated on Nov. 18, 2026 in Space

Spanish rocket company PLD Space has signed its first commercial launch contract, with Japan's Mitsubishi Electric, to put a small Mitsubishi Electric satellite into orbit aboard its MIURA 5 rocket. The launch is research-stage: MIURA 5 has not yet flown to orbit, and the mission will fly on the vehicle's second test flight to low Earth orbit. Financial terms of the contract were not disclosed.
Why it matters
The deal is a concrete step toward independent European launch capability for small satellites, as the region looks to reduce reliance on US-based SpaceX. Mitsubishi Electric, a strategic partner and investor, is also tying the launch to its own satellite megaconstellation, which would depend on dependable access to orbit.
The funding extension is valued at €108 million, roughly $119 million, and was led by Mitsubishi Electric. The forecast of $1 trillion for the launch sector by 2030 comes from some analysts, not an established market measure, and the contract's own cost remains undisclosed.
The players
PLD Space
A Spanish rocket company developing the MIURA 5 small-launch vehicle and known for Europe's first fully private suborbital launch in 2023.
Mitsubishi Electric
A Japanese electronics and satellite manufacturer, and strategic partner and investor in PLD Space, developing a satellite megaconstellation.
The details
PLD Space is building MIURA 5, a rocket designed to deliver small satellites to low Earth orbit, the roughly 200 to 2,000 kilometre band where many Earth-observation and communications satellites operate. Under the contract, a small Mitsubishi Electric satellite will ride on the vehicle's second test flight rather than a dedicated mission. PLD Space previously carried out Europe's first fully private suborbital launch in 2023, which tests flight hardware without reaching orbit.
Timeline
September 2026: Mitsubishi Electric led the extension of PLD Space's equity funding round.
2023: PLD Space carried out Europe's first fully private suborbital rocket launch.
First half of 2027: PLD Space targets the first orbital test flight of MIURA 5 from French Guiana.
2030: Some analysts forecast the space launch sector could be worth as much as $1 trillion.
The Tech Race
The contract places PLD Space's MIURA 5 against SpaceX's established small-launch business as Europe builds independent access to orbit. Its outcome depends on a first orbital test flight that is targeted for the first half of 2027 but has not yet happened.
The launch will not change services for ordinary users in the near term, since the mission is contracted but the rocket has not yet reached orbit. For satellite operators and the companies building constellations, a European option for small-satellite launch could widen the choices available to them if MIURA 5 performs as planned.
The takeaway
The contract signals that European launch providers are beginning to win commercial customers, but the claim rests on a test flight not yet flown. Watch for the MIURA 5 first orbital test flight from French Guiana, targeted for the first half of 2027, as the milestone that will show whether the schedule holds.
What happens next
PLD Space targets the first orbital test flight of MIURA 5 from French Guiana in the first half of 2027, and the Mitsubishi Electric satellite flies on the vehicle's second test flight after that.
Further reading
For broader context on how launch providers are reshaping access to orbit, explore our Space coverage.


