Army Selects Fort Benning for Nuclear Microreactor Site
The base is slated to host three 1-megawatt reactors by 2028 to bolster mission-critical energy independence.
Updated on Oct. 20, 2026 in Nuclear

Live Poll
Do you support the installation of nuclear microreactors on military bases to ensure energy security?
In August 2026, the United States Army selected Fort Benning as one of five potential host sites for its Janus Program microreactor initiative. The project, which remains in the planning stages pending environmental reviews, will deploy three 1-megawatt reactors to support mission-critical infrastructure.
Why it matters
This initiative aims to ensure key military facilities remain powered during commercial grid failures. It marks a push toward on-site, modular nuclear generation to harden defense infrastructure against external energy disruptions.
Each Kaleidos microreactor provides a 1-megawatt capacity, which is sufficient to power approximately 1,000 homes. These units use TRISO fuel—a robust fuel type encased in ceramic layers to prevent radioactive release—and helium gas cooling.
The players
United States Army
The military branch responsible for implementing the Janus Program across various installations.
Radiant Nuclear
An energy company developing modular nuclear microreactors based in El Segundo, California.
The details
The Kaleidos microreactor functions as a closed-loop system using helium gas as a coolant to transfer heat from the TRISO (TRi-structural ISOtropic) fuel particles to a power conversion cycle. This design allows for a compact footprint, with individual units intended to operate for five years before requiring refueling. Radiant Nuclear is establishing a manufacturing facility in Oak Ridge, Tennessee, capable of producing 50 of these modular units annually.
Timeline
August 2026: The United States Army officially selected Fort Benning as a host site.
October 2026: Representatives from Radiant Nuclear conducted a site visit at Fort Benning.
2028: The target date for the first microreactors to become operational.
The Tech Race
The military's adoption of nuclear microreactors follows the objectives established by the Department of Defense Janus Program. This site selection represents a concrete milestone in the deployment strategy to move beyond large-scale reactors toward modular, mobile energy solutions.
The installation at Fort Benning will provide a localized power source for mission-critical facilities on the base. Residents in Columbus should monitor upcoming environmental and cultural impact surveys as these assessments are required before final project approval.
The takeaway
The Army is signaling a transition toward decentralized, modular nuclear power to protect infrastructure. Interested parties should track the completion of environmental surveys, which serves as the final gating factor for project construction.
Further reading
For more on the development of modular energy, see our coverage in Nuclear.
Live Poll
Do you support the installation of nuclear microreactors on military bases to ensure energy security?

