We Are the Frontier

Wyoming Rare Earth Project Shows Strong Grades

Certified assays from 18 drill holes support open-pit development at Halleck Creek, with an updated resource estimate still to come.

Updated on Nov. 16, 2026 in Quantum Computing

Screen-print poster illustration of unmarked drill core cylinders in a steel tray on a wooden bench, with flat high-plains horizon in warm ochre and rust tones.
American Rare Earths Ltd reported certified assays from 18 drill holes totaling 2,879.6 metres at its Halleck Creek project in Wyoming, ahead of an updated resource estimate. AI Illustration. Upload story photo >

American Rare Earths Ltd completed its 2026 feasibility drilling program at the Halleck Creek Rare Earths Project in Wyoming, with certified assays now received from all 18 HQ core holes totaling 2,879.6 metres. The work is a drilling and assay program at the feasibility stage; no mine is operating and the project remains in development.

Why it matters

The assays feed an updated geological model and mineral resource estimate, which will underpin the ongoing feasibility study and the open-pit approach outlined in the September 2026 scoping study. For Wyoming, the results add confidence to a project in Albany and Platte counties that is being evaluated as a domestic source of rare earth oxides.

The program drilled 18 HQ core holes totaling 2,879.6 metres, with core recovery averaging 96.2 percent across the program. The highest individual assay reached 13,871 ppm TREO over 0.80 metres, while the project is estimated to contain 8.65 million tonnes of rare earth oxides.

The players

American Rare Earths Ltd

An Australian-listed rare earths explorer and developer whose flagship asset is the Halleck Creek project in Wyoming.

The details

Drilling was designed to raise geological confidence in areas relevant to the early mining sequence at the proposed Cowboy State Mine. Total rare earth oxides, or TREO, is the combined measure of the rare earth elements in a rock sample, expressed in parts per million, and the assays report how concentrated those elements are along each drilled interval. Core recovery, the share of the rock column successfully brought to surface, averaged 96.2 percent, which supports the reliability of the sampled grades. The company will fold these assays into an updated geological model and mineral resource estimate.

Timeline

  1. September 2026: Scoping study outlining the open-pit development approach was released.

  2. 2026: The feasibility drilling program at Halleck Creek was completed.

The Tech Race

The Halleck Creek results build on the Cowboy State Mine resource, which applied a 1,000 ppm TREO cut-off, and most new samples clear that threshold. Confirming grade across a larger area strengthens the case for open-pit development against other domestic rare earth projects still at the drilling stage.

For Wyoming residents, the project is a potential future source of employment and local activity if it advances to construction and operation. Timing for any mine development remains uncertain, and no production date has been set.

The takeaway

Watch for the updated mineral resource estimate that will incorporate these 18 holes and the final collar survey. A revised resource figure that holds grade across the Red Mountain area would be a concrete signal for the feasibility study's progress.

What happens next

The updated mineral resource estimate and the completion of the feasibility study are the next milestones for the project.

Further reading

For related developments, explore Quantum Computing coverage across the site.