IRIS2 Satellite Network Locks In Launch Schedule
Firm contracts for 53 satellites set a 2029 launch start, with IRIS2 entering service in 2030 and 2031 under a planned European constellation.
Updated on Nov. 6, 2026 in Space

SES has secured firm launch contracts for satellites in its planned IRIS2 European constellation, covering seven geostationary satellites, 28 medium Earth orbit (MEO) satellites and 18 mid-Earth orbiting satellites. The contracts are firm commitments, but the IRIS2 satellites are not yet launched or in service; they are scheduled to enter service in 2030 and 2031.
Why it matters
The contracts lock in the launch schedule for a large European satellite network, while SES builds a new satellite construction and assembly facility. The same period includes SES's clearance of 160 MHz of upper C-band spectrum over the United States, a requirement set by the Federal Communications Commission (FCC), which shows how satellite operators are reallocating spectrum across the two regions.
SES holds firm launch contracts for 53 satellites in total, including seven geostationary satellites, 28 MEO satellites and 18 mid-Earth orbiting satellites. The C-band clearance covers 160 MHz of upper C-band spectrum over the US, with a reimbursable cost of $3.6 billion (€3.2bn) against up to $5.6 billion in maximum earnings after clearing is complete.
The players
SES
A satellite operator whose fleet and ground infrastructure serve media and data customers, currently building an assembly facility for the IRIS2 constellation.
Federal Communications Commission (FCC)
The US federal agency that set the requirement for SES to clear upper C-band spectrum over the United States.
The details
SES is building a satellite construction and assembly facility where it will handle assembly, integration and testing of the satellites. Geostationary satellites orbit at about 36,000 kilometres, staying fixed over one point on Earth, while MEO satellites orbit at lower altitudes and move across the sky. SES's clearance of upper C-band spectrum frees radio frequencies that US media clients have used for satellite delivery, with the FCC funding replacement satellites to be launched by 2029.
Timeline
2028: SES's satellite facility becomes fully operational.
2029: IRIS2 satellites begin their launch missions and replacement satellites launch.
2030: All IRIS2 launches complete and the satellites enter service.
2031: IRIS2 satellites continue entering service.
The Tech Race
SES's IRIS2 contracts place it inside the European IRIS2 constellation effort, which is a government-backed alternative to large US-led low Earth orbit broadband networks. The US spectrum clearance under the FCC requirement shows operators reallocating radio bands to make room for new satellite services.
Satellite television and data users served by SES's US media clients may continue to receive service after the C-band clearance, as SES expects those clients to keep using satellite delivery. IRIS2 services are not expected to reach users until they enter service in 2030 and 2031.
The takeaway
Watch for the first IRIS2 launch in 2029, which will show whether the schedule set by the firm contracts holds. The completion of the US upper C-band clearance will also indicate whether SES's transition works without service disruption for its media clients.
What happens next
IRIS2 satellites are scheduled to begin launch missions in 2029, with replacement satellites launching the same year and all IRIS2 launches completing by 2030.
Further reading
For broader context on how satellite constellations and spectrum allocation are developing, explore the Space section.
Source note: This article includes information reported by Advanced-television.


