Artemis III Plans Docking Test With Two Lunar Landers
The 2027 mission would test commercial lander docking, a step toward the Artemis IV goal of crewed lunar surface landings.
Updated on Nov. 7, 2026 in Space

Live Poll
Should the U.S. government keep funding NASA's crewed lunar missions?
NASA held the two-day Max Power air show at Kennedy Space Center's former shuttle runway, starting November 7, 2026, featuring the five-jet NASA Freedom 250 performance team and an Air Force Thunderbirds routine. NASA Administrator Jared Isaacman flew two jets, flew a MiG-29 solo, and parachuted from an airplane during the event. The air show is a public event that has already occurred, not an announced capability.
Why it matters
The event pairs public-facing aviation spectacle with a push toward the Artemis program, which aims to return humans to the lunar surface. Artemis III crew discussions about docking with two separate lunar landers from different companies signal how commercial hardware is being folded into the mission architecture.
The Artemis III mission will use the Space Launch System with Orion, a Blue Origin New Glenn launching a Blue Moon lander, and a SpaceX Starship. The 2027 test is planned to demonstrate docking with two different lunar landers, but performance benchmarks for that docking were not provided in the source.
The players
NASA
The U.S. space agency, operating the Space Launch System and Orion spacecraft and running the Artemis program toward crewed lunar landings.
Jared Isaacman
NASA Administrator who founded Draken, a Lakeland-based company that trains jet fighter pilots, and who flew multiple aircraft during the air show.
Blue Origin
Space company developing the New Glenn launch vehicle and the Blue Moon lunar lander, which is part of the Artemis III mission.
SpaceX
Space company developing the Starship vehicle, which is planned to serve as a lunar lander for the Artemis III mission.
Randy Bresnik
NASA astronaut who led the Artemis III crew.
The details
The air show ran on the former shuttle runway, where 78 space shuttle orbiters historically touched down, and crowds were spread across its west end. Demonstration flights included jet performances by NASA's five-jet Freedom 250 team, a solo MiG-29 flight by Isaacman, and the Thunderbirds' 45-minute routine. The Artemis III plan involves Orion riding the Space Launch System, with separate commercial landers from Blue Origin and SpaceX also taking part in the mission design.
Timeline
November 7, 2026: Max Power air show opens at Kennedy Space Center.
November 8, 2026: Second day of the air show is scheduled.
2027: Artemis III docking test mission is planned.
The Tech Race
The Artemis III plan pits lunar lander designs from Blue Origin and SpaceX against each other within one mission architecture. The 2027 docking test extends that competition into an operational demonstration, following the earlier shuttle-era reliance on a single government-built orbiter.
Members of the public near Kennedy Space Center could attend the two-day air show, which ran on the former shuttle runway. For most people the Artemis III plans remain a 2027 milestone with no near-term change to daily life.
The takeaway
Watch the Artemis III docking test planned for 2027, since it will show whether two commercial landers from separate companies can work within one NASA mission. Tracking that test will show how close the program is to the Artemis IV goal of putting humans on the lunar surface.
What happens next
The air show will repeat its performances on Sunday, November 8, 2026, and the Artemis III docking test is planned for 2027.
Further reading
For more on the program behind these plans, explore Space coverage across our Florida edition.
Live Poll
Should the U.S. government keep funding NASA's crewed lunar missions?




