We Are the Frontier

New $63.7M State Lab Opens in Bismarck

The shared laboratory consolidates state health and environmental testing on the Capitol grounds, with capacity planned for future test types.

Updated on Nov. 4, 2026 in Life Sciences

Wide daylight view of a modern three-story pale stone and glass laboratory building on an open lawn with bare winter trees and a flat plains horizon.
Kraus-Anderson completed a $63.7 million, three-story state laboratory on the Bismarck Capitol grounds that will consolidate health and environmental testing. AI Illustration. Upload story photo >

Kraus-Anderson has completed a $63.7 million laboratory facility on the State Capitol grounds in Bismarck, North Dakota, adjacent to the State Museum. The three-story, 104,230-square-foot building was designed by Zerr Berg Architects for the Department of Health and Human Services and the Department of Environmental Quality. The facility is a completed building, not an announced project.

Why it matters

Consolidating state public-health and environmental testing into one shared facility lets separate departments pool equipment and staff rather than operating isolated labs. The building also expands capacity for future test types, including toxicology of non-fatal overdoses and hematology and chemistry work for state correctional facilities.

The building is a three-story, 104,230-square-foot laboratory built at a total cost of $63.7 million. The source gives no performance benchmarks, throughput figures, or prior-facility comparisons for the lab's testing capacity.

The players

Kraus-Anderson

A construction firm that built the $63.7 million laboratory facility on the State Capitol grounds in Bismarck.

Zerr Berg Architects

The architecture firm that designed the three-story, 104,230-square-foot state laboratory in Bismarck.

North Dakota Department of Health and Human Services

A state agency that will operate in the new Bismarck laboratory alongside the Department of Environmental Quality.

North Dakota Department of Environmental Quality

A state agency that will share the new Bismarck laboratory with the Department of Health and Human Services.

The details

The facility houses separate state departments under one roof and is designed so they share resources such as equipment and laboratory space rather than duplicating them. Its expanded capacity is meant to accommodate future test categories, including toxicology for non-fatal overdoses, hematology (analysis of blood and blood-forming tissue), and chemistry tests for North Dakota correctional facilities. Construction began in April 2024 and was completed by Kraus-Anderson, with Zerr Berg Architects serving as designer.

Timeline

  1. April 2024: Construction of the laboratory facility began.

  2. November 4, 2026: Kraus-Anderson completed the laboratory facility.

The Tech Race

The laboratory is a completed state building rather than a research program, so its place in the field is as public-health testing infrastructure. The source does not name a competing lab effort or a prior milestone it is measured against.

The shared facility is intended to let North Dakota's health and environmental agencies run more kinds of tests in one place, with capacity planned for toxicology and correctional-facility testing. The source does not state when those new test types will begin or how they will be made available to the public.

The takeaway

The new Bismarck laboratory consolidates state testing capacity into one building that is designed to absorb future test categories. Watch for the date when the planned toxicology, hematology, and correctional-facility testing begins in the new space.

Further reading

For broader context on the research and testing work such a facility supports, explore Life Sciences coverage.